6 Fairlight Cr Project
Worked with council on all aspects of redevelopment of this unit block from Development Application through to Occupation Certificate.
Project Managed all aspects of the build which included a new front entry and pathway, larger windows, replacement of rusted brick ties, the addition of new car parking spaces, and a lift. Asset improvement was achieved by the construction of a new top floor apartment and improving existing apartments natural light and air flow and internal layout by changing each unit from a single bedroom into two bedroom apartments. To meet The Australian New Window Standard ‘to not facilitate climbing’ (thereby risking potential falls from the building) a fixed light panel was positioned below the slider.